Typical drawings

Typical drawings

Typical drawings inform the designer of our engineering standards which may be one acceptable method, or our preferred method of complying with engineering standards.

Typical drawings are generally specific to types of infrastructure. They may be used by designers as a base to develop their own designs. They are not to be used as construction documents and must be reviewed and modified, as required, by designers to produce project specific design drawings for construction. We accept no responsibility for contractor designs based on typical drawings or assets constructed to typical drawings.

Electrical

Responsible: Principal Engineer, Electrical
Drawing No.TitleRevisionDate

TYP-03-00001

Typical Drawings for Wastewater Pump Station Switchboard2.106/07/2023
TYP-23-00002Typical Drawings for Wastewater Pump Station Switchboard – Safety in Design Hazard Register_06/07/2023

Structural

Responsible: Principal Engineer, Civil Structural
Drawing No.TitleRevisionDate

5007-00001

Above Ground Tank Safe Access
1.0
07/06/2016

Expertise

Responsible: Refer to Document Control Page of Standard
Drawing No.TitleRevisionDate

TYP-08-00001

Generic Chemical Dosing Process and Instrumentation Diagram
0.1
23/08/2023

  • Major faults

  • Underway

  • Polkinghorns Rd
  • Arthurton
  • 18/06/2020
  • Water Supply On
  • 18/06/2020 03:05 PM - We are attending to an incident in Arthurton with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07505663.
  • See all major faults

  • Scheduled works

  • Underway
  • Spruance Rd
  • Elizabeth East
  • 11/06/2021
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 15/06/2021 09:00 AM
    Estimated restore time and water supply back on: 15/06/2021 04:00 PM

    We’re improving your services and undertaking maintenance work in Elizabeth East. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works