Technical guidelines
Technical guidelines
Technical guidelines inform the designer of principles and practices to be applied to the construction and modification of our assets.
Guidelines cover the design of particular types of infrastructure (such as pumping stations) as well as systems (such as electrical and computer-based) and are applicable to all infrastructure types. It is intended that technical guidelines form part of the project contract documentation and the principles and practices they specify are contractually binding upon designers and constructors.
01 - General
Responsible: Manager Engineering Technical Services - Murat Aksoy | |||
---|---|---|---|
Legacy Number | New Number | Title | Version |
TG 110 | TG 0100 | Safety In Design | 1 |
02 - Mechanical & Hydraulics
Responsible: Principal Engineer, Mechanical & Hydraulics - Gordon Holmes | |||
---|---|---|---|
Legacy Number | New Number | Title | Version |
TG 32 | TG 0210 | Hydraulic Aspects of Pumping and Gravity Mains | 1 |
03 - Electrical
Responsible: Principal Engineer, Electrical - Justin Hamra | |||
---|---|---|---|
Legacy Number | New Number | Title | Version |
05 - Reticulation Networks
Responsible: Principal Engineer, Reticulation Networks - Tom Galek | |||
---|---|---|---|
Legacy Number | New Number | Title | Version |
TG 11a | TG 0500 | The Design Of Sewerage Systems (Extract Of Par 4 And 5) | 1 |
06 - Civil
Responsible: Principal Engineer, Civil & Structural - Hany Habib | |||
---|---|---|---|
Legacy Number | New Number | Title | Version |
TG 96 | TG 0621 | The Design Of Anchors And Thrust Blocks On Buried Pipelines With Unrestrained Flexible Join And For The Anchorage Of Pipes On Steep Grades | 1 |
TG 104 | TG 0622 | Design Of Pipe End Dissipators | 1 |
06 - Civil (Geotechnical)
Responsible: Principal Engineer, Dams and Geotechnical - Moji Kan | |||
---|---|---|---|
General technical information for geotechnical design comprising of 10 sections | |||
Legacy Number | New Number | Title | Version |
TG 10c | TG 0631 | General Technical Information for Geotechnical Design - Earthworks | 2 |
TG 10a | TG 0632 | General Technical Information for Geotechnical Design - Compaction | 2 |
TG 10g | TG 0633 | General Technical Information for Geotechnical Design Part G - Materials | 1 |
TG 10l | TG 0634 | General Technical Information for Geotechnical Design Part L - Soil Testing | 1 |
TG 10h | TG 0635 | General Technical Information for Geotechnical Design Part H - Permeability | 1 |
TG 10f | TG 0636 | General Technical Information for Geotechnical Design Part F - Lined Storages | 1 |
TG 10j | TG 0637 | General Technical Information for Geotechnical Design Part J - Pipelines | 1 |
TG 10e | TG 0638 | General Technical Information for Geotechnical Design Part E - Hydrogeology | 1 |
TG 10i | TG 0639 | General Technical Information for Geotechnical Design Part I - Pile Driving | 1 |
TG 10m | TG 0640 | General Technical Information for Geotechnical Design Part M - Survey Pillars | 1 |
07 - Structural
Responsible: Principal Engineer, Civil & Structural - Hany Habib | |||
---|---|---|---|
Legacy Number | New Number | Title | Version |
TG 106 | TG 0720 | Above Ground Circular Concrete Tanks | 1 |
Major faults
Darebin St
Mile End
- 16/01/2020
Water Supply On
- 16/01/2020 01:17 PM - We are attending to an incident in Mile End with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07265949.
- See all major faults
Underway
Scheduled works
- There are currently no scheduled works impacting customers
- See all scheduled works